Home Renovation Tips for a Smooth & Successful Remodeling

A home renovation can begin with something as simple as wanting a brighter kitchen or a more refined bathroom layout. Then the decisions start piling up.

4 Minute Read

 Print
 Favorites

Should the old flooring stay? Does the electrical wiring need an upgrade? Which fixtures will complement the new layout? When should the contractor order them?

The answers aren't always obvious when you're looking at an empty room or a set of drawings. That's why home renovation planning needs to happen before the first demolition begins. A clear scope, a workable budget, and a little attention to the order of work can prevent many of the problems that tend to appear halfway through a remodel.

Assess your home before renovating

Before choosing a new look, understand what you're working with. Walk through the house and look beyond the finishes. Check for:

  • Dampness and seepage
  • Damaged flooring
  • Old wiring
  • Plumbing issues
  • Poor ventilation

In a bathroom, inspect the waterproofing and drainage before deciding that the tiles are the only thing that needs replacing.

This is also the point to decide how extensive the home renovation really needs to be. A home that needs new paint, flooring and storage doesn't require the same plan as one where walls, plumbing and electrical systems are being changed.

Make a list of the work, then separate essential repairs from improvements that can wait. It gives the budget somewhere sensible to start.

Check your budget

Renovation budgets have a way of becoming unrealistic when product selection comes first.

A better approach while remodeling your home is to price the project according to the work involved. The calculation needs to include:

  • Civil work and labour
  • Plumbing and electrical work
  • Flooring
  • Cabinetry
  • Lighting
  • Sanitaryware and faucets
  • Installation
  • Delivery and removal of construction waste

Keep a contingency aside for things that aren't visible at the beginning. When comparing contractor quotations, read the inclusions rather than comparing the totals alone.

Get the measurements and layout right

A home renovation becomes considerably harder once work has started and the basic layout is still being debated.

Measure rooms, doors, windows, and ceiling heights. Note the position of plumbing and electrical points. Think about where furniture will sit and how people will move around it.

Bathrooms need particular attention when remodeling your home because several decisions depend on one another. The toilet, basin, and shower have to fit the available space, while drainage, water connections, electrical points, and ventilation need to be considered before the finishes are installed. For smaller bathrooms and powder rooms, the Kohler Reach one-piece round-front toilet offers a compact, easy-to-clean option.

The same applies to kitchens. Appliance dimensions, counter space, sink position, storage, and electrical connections should make sense together.

Once you’ve figured out the dimensions and layout, you can choose materials and products accordingly.

Don't leave bathroom planning until the end

Bathrooms may occupy less space than a living room, but they involve plenty of decisions.

Product selection should happen early enough for the site team to work from the correct specifications. For homeowners still working through those choices, Kohler Concierge can be a useful starting point when renovating your house. It is our personalised bathroom planning service that helps you explore Kohler products and make more informed selections for your space. You can get guidance on suitable products, features and finishes while you're still deciding what belongs in the new bathroom. Once the shortlist is clearer, the journey can continue at a Kohler store or Experience Centre to explore products and finishes in person.

Find a contractor who can work with the plan

A contractor should be able to understand the sequence, coordinate different trades, and flag problems before they become expensive changes. Look at previous work and ask relevant questions before appointing one.

  • Who is buying the materials?
  • Who handles installation?
  • Which jobs are included?
  • What happens if the scope changes?

Put the agreed details in writing, including payment stages and the expected timeline. There may be several people working on the renovation at different points: plumbers, electricians, carpenters, painters, tile installers, and others. If nobody is keeping track of what needs to happen next, delays can spread from one trade to another.

Follow the right sequence

The order of work isn't something to leave entirely to chance.

  • Demolition generally comes before new construction.
  • Structural work and concealed plumbing or electrical work need to happen before surfaces are closed up.
  • Waterproofing has to be completed before bathroom finishes.
  • Painting and fixed cabinetry need to be planned around the work that follows.

The exact sequence will vary depending on the property and scope, but one rule is fairly universal: don't finish something before the work that could damage it is complete.

Keep procurement connected to the schedule

Having selected a product doesn't mean it's ready for installation.

Check availability and delivery times before fixing dates with the contractor. Keep track of what has been ordered and what is still pending. If a particular fixture is needed before another part of the work can be completed, its delivery needs to be part of the schedule.

The useful point is simple: materials should arrive when the site is ready for them.

Be careful with changes once renovation begins

Some changes are unavoidable when renovating your house. Others begin with, "Since we're already doing this…"

That extra light, larger cabinet, or different tile may sound like a small adjustment. It may also mean moving wiring, changing measurements, or redoing work that has already been completed.

Before approving a change, find out what it affects. Ask about the additional cost and whether it will push the schedule. Keeping a written record of changes is useful too.

Think about what living through the renovation will involve

A home renovation looks different when it's happening in your own home.

If possible, decide in advance which rooms will remain usable. A temporary kitchen may be needed if the main one is being rebuilt. The same applies to a bathroom. Furniture may need to be moved or covered, and finished areas may need protection from dust and construction traffic.

Apartment renovations have another layer of planning. Building rules may cover working hours, movement of materials, lift use, and disposal of debris. Check these before work starts.

Inspect the work before the project is signed off

The final walkthrough while renovating your home will include more than just checking whether the paint looks good.

  • Check drainage.
  • Look underneath plumbing connections for leaks.
  • Test electrical points and lights.
  • Open cabinet doors and drawers.
  • Check that doors move freely and that visible finishes are clean and properly completed.

Make a list and have the outstanding items addressed before the home renovation is considered complete.

Keep the invoices, warranties, installation information, and product details together once everything is finished.

Frequently Asked Questions

Start by assessing the existing house and defining the scope of work. Identify repairs, layout changes and upgrades before setting the budget or ordering materials.

There isn't one fixed amount that applies to every home. Keep a separate contingency within the project budget based on the property's condition and the extent of the renovation.

Structural changes, demolition and concealed plumbing or electrical work generally need to happen before flooring, finishes and fixtures. The exact sequence depends on the project.

Choose them while the layout and plumbing are still being planned. Fixture dimensions and installation requirements can affect where connections and other elements need to be placed.

Finalise important decisions early, check product availability, coordinate deliveries with the work schedule and keep any changes to the agreed scope documented.